GKN Aerospace

Composites HVAC Replacement

We replaced and re-piped 15 pieces of HVAC equipment.  Our coordination and scheduling with the owner and our subcontractors let us do this work without impacting production.

  • The replaced equipment includes three 350 ton centrifugal chillers and five large air handling units with chilled water, heating hot water, and steam piping
  • The chillers and air handling units were replaced one at a time to allow continuous operation of a portion of the system
GKN Aerospace
  • Location: St. Louis, Missouri
  • Size: Medium
  • Markets:
  • Services: