GKN Aerospace
Composites HVAC Replacement
We replaced and re-piped 15 pieces of HVAC equipment. Our coordination and scheduling with the owner and our subcontractors let us do this work without impacting production.
- The replaced equipment includes three 350 ton centrifugal chillers and five large air handling units with chilled water, heating hot water, and steam piping
- The chillers and air handling units were replaced one at a time to allow continuous operation of a portion of the system
- Location: St. Louis, Missouri
- Size: Medium
- Markets: Industrial
- Services: HVAC