BJC Institute of Health
Corrigan Company installed the entire HVAC system as well as a fuel/oil piping delivery and storage system.
Corrigan Company installed the entire HVAC system as well as a fuel/oil piping delivery and storage system for emergency backup power along with the medical gas/medical equipment piping for this new 11 story – 700,000 square feet facility.
- 5,500 tons of chillers
- 6,500 tons of cooling towers
- Air handling units capable of delivering 400,000 CFM
- Steam lines
- Pumps
- Reverse Osmosis System
Lyon Sheet Metal, Inc. installed the entire air distribution system.
“Corrigan was a pleasure to work with. John and his team kept their heads down and worked without complaint. Very Satisfied with their performance on this project." Brian Bea, S.M. Wilson