Centene Urban Campus

Corrigan Company’s scope of work included the installation of the underground plumbing, drain tile, storm, sanitary, hot water, hot water return and cold water systems, fixtures and plumbing equipment.

The Centene tower is a class A office building with 28 floors above street level and 3 floors below for a total of 31 floors.  The tower has approximately 800,000 square feet of space and is located in Clayton, Missouri.

Corrigan Company’s scope of work included the installation of the underground plumbing, drain tile, storm, sanitary, hot water, hot water return and cold water systems, fixtures and plumbing equipment.

Corrigan Company accomplished the coordination process via 3D/BIM. With the most up to date Revit and CAD software, our drafting department worked extensively with other trades on a day to day basis to achieve a virtually clash free model. The coordinated model was used to create bathroom drawings, which were then fabricated in our shop and then sent to the field for installation. By using this coordinated model we eliminate the guess work and also minimized the majority of in-field coordination which allowed for an efficient unload and install process.

  • – Coordination process via 3D/BIM
  • – Our team worked extensively with other trades to create clash free model
  • – Our Fabrication shop fabricated a ready to install product based on the coordinated drawings